As I lay on the couch with my back recovering after it locked up on Friday morning, really slowing down progress on 2 of the jobs we have on at the moment. I thought I would get this blog wrote.
Kitchen Job
We have just completed a full kitchen renovation, it was quite a tricky one due to the constraints of the design, boiler and size of the room. But with the great team we have, we got it done. It consisted of a full rewire, new plumbing and moving of the main shut off valve to the new sink unit. Once the guys got there work done we levelled the ceiling and put new plasterboard up giving it a beautifully flat ceiling. Then the Plasterer came in and plastered the whole room. We like to get the painter in to paint everything before fitting of the kitchen, it makes his life easier which gives us a better finish.
I am well chuffed on the outcome of the kitchen as it's a great transformation
Bathroom
On the same job, we are renovating the bathroom also and it's looking great we have the vanity unit worktop to fit and some siliconing to be done will post finished photos next blog.
En-suite
We are also working on an en-suite for a previous customer, this also is looking great. Photos of the finish to follow.
Tv unit
We also got the tv unit fitted this week. Glad to have this finished. We had some issues with the paint we used for the first time as a recommended product but we just had so many issues with it and caused serious delays.
We won't let anything below our high standards leave the Workshop, we finally got the finish we wanted and well pleased with the result and the customers were over the moon with the finished unit
Thanks for taking the time to read our blog. If you would share our work it would be much appreciated
Thanks Rob