Blog #4

As I lay on the couch with my back recovering ​after it locked up on Friday morning, really slowing down progress on 2 of the jobs we have on at the moment. I thought I would get this blog wrote. 

Kitchen Job ​

IMAGE.JPG

We have just completed a full kitchen renovation, it was quite a tricky one due to the constraints of the design, boiler and size of the room. But with the great team we have, we got it done. It consisted of a full rewire,  new plumbing and moving of the main shut off valve to the new sink unit. Once the guys got there work done we levelled the ceiling and put new plasterboard up giving it a beautifully flat ceiling. Then the Plasterer came in and plastered the whole room. We like to get the painter in to paint everything before fitting of the kitchen, it makes his life easier which gives us a better finish.

IMAGE.JPG

I am well chuffed on the outcome of the kitchen as it's a great transformation  

​Bathroom 

IMAGE.JPG

On the same job, we are renovating the bathroom also and it's looking great we have the vanity unit worktop to fit and some siliconing ​to be done will post finished photos next blog.

En-suite ​

IMAGE.JPG

We are also working on an en-suite for a previous customer, this also is looking great. Photos of the finish to follow. 

 

 

Tv unit  

We also got the tv unit fitted this week. Glad to have this finished. We had some issues with the paint we used for the first time as a recommended product but we just had so many issues with it and caused serious delays.

We won't let anything below our high standards leave the Workshop, we finally got the finish we wanted and well pleased with the result and the customers were over the moon with the finished unit 

IMG_1448.JPG

Thanks for taking the time to read our blog. If you would share our work it would be much appreciated 

Thanks Rob